Factory
Inside our Ajman perfume factory
A look inside our Ajman production site: compounding lab, automated filling and capping lines, decoration hall, gift set assembly and export warehouse.
One site, every stage
Because compounding, filling, decoration and assembly all sit under one roof in Ajman, a change to your bottle finish or carton does not have to travel between suppliers. That keeps lead times short and makes it realistic to run a small first batch before committing to volume.
- Location
- Al Jurf Industrial 2
- Emirate
- Ajman, UAE
- Production since
- 2010
- Shipping to
- 100+ countries
Production areas
Compounding and maceration
Concentrates are weighed and blended to the approved formula, then macerated before filling so the scent profile settles.
Automated filling and capping
Filling lines handle small trial batches through high-volume runs on the same specification, with fill-level and torque checks.
Decoration hall
Screen printing, hot foiling, spray coating and acid-etched frosting are done in-house, keeping colour consistent between reorders.
Gift set assembly
Rigid boxes, inserts, sleeves and cellophane wrapping are assembled by hand for retail-ready presentation.
Quality control
Each batch carries a certificate of analysis with leak, torque and colour checks before it is released for packing.
Export warehouse
Palletising, export documentation and freight booking are handled on site so your shipment leaves ready for customs.
Factory gallery

Automated filling and capping line

Quality control and compounding lab

Export warehouse and palletising bay

Decoration hall — printing and foiling

Gift set assembly and finishing
From brief to delivery
Every order follows the same nine stages, so you always know what is happening next.
- Step 01
Consultation
Brief, budget, target market and volume mapped in one call.
- Step 02
Fragrance Development
Perfumers build 2-4 directions from your brief or reference.
- Step 03
Bottle Selection
Stock library or dedicated mould, matched to your neck standard.
- Step 04
Packaging Design
Dielines, artwork and 3D mockups from our in-house studio.
- Step 05
Sampling
Physical pre-production samples couriered for approval.
- Step 06
Approval
Signed specification sheet locks scent, fill, finish and carton.
- Step 07
Mass Production
Compounding, maceration, filling and assembly at scale.
- Step 08
Quality Control
Batch COA, leak, torque and colour checks before packing.
- Step 09
Worldwide Delivery
Export documentation, palletising and freight to your door.
Want to see it in person?
Clients are welcome to visit the Ajman site. Tell us when you're in the UAE and we'll arrange a factory tour.